Sustainability

The Illinois Tollway is committed to fostering environmental responsibility and sustainability in everything the agency does from planning and design through construction, maintenance and operations. Protecting natural resources and providing safe and effective transportation are in the public interest and addressing both of them is good public policy and practice.

Working together with communities and regulatory agencies, the Tollway strives to plan, design and construct roadway projects in accordance with local, state and federal regulations while using best practices to protect and enhance the natural and physical environment.

Although the Tollway receives no state or federal funding, the agency adheres to the National Environmental Policy Act.

 

Spotlight on Pollinator Efforts

In honor of National Pollinator Week, the Illinois Tollway was recognized as a pollinator habitat champion by the Energy Resources Center (ERC) (opens in a new tab) located within the College of Engineering at the University of Illinois at Chicago (UIC).

The ERC is an interdisciplinary public service, research and special projects organization that works to improve energy efficiency and the environment.

Monarch butterfly on native plants in an Illinois Tollway pollinator habitat area.

Wildflower and native grass pollinator habitat planted along the Illinois Tollway corridor.

 

Landscape Master Plan

Green seedling icon representing tree planting and landscape initiative.The Illinois Tollway’s Landscape Master Plan was developed with the goal of establishing and maintaining healthy tree communities throughout the Tollway’s 294-miles, 5 roadways and 12 counties.

Objectives

In partnership with The Morton Arboretum and the Chicago Region Trees Initiative, this Master Plan will guide Tollway efforts to:

  • Install 58,000 trees with the intent of increasing regional tree canopy coverage
  • Develop experimental approaches to planting that could test new ideas for tree installation and care in stressful roadway conditions
  • Develop maintenance programs to better ensure the long-term viability of future planting efforts
  • Evaluate and develop a diverse list of plant species and material suitable for high speed roadways
  • Identify viable living snow fence locations

Learn more (opens in a new tab)

Illinois Tollway Landscape Master Plan partnership infographic showing benefits of trees: Stabilizing Soil, Filtering Stormwater, Controlling Snow Drift, and Beautification of the Region.

 

Mitigation

Green wetland grass icon representing environmental mitigation efforts.As part of the Illinois Tollway’s efforts to offset the impacts of roadway construction on local and regional natural resources, environmental mitigation has taken place, and continues to take place, throughout the counties served by the Tollway. The goal of wetland mitigation is to restore and improve natural resources that are impacted during construction. 

This has been accomplished through the re-establishment of historic wetlands and the enhancement of existing wetlands, as well as through stream restoration, the control of invasive plant species and native planting and seeding programs. Wetlands provide a variety of important ecosystem services, such as storing floodwaters, cleaning and recharging groundwater, sequestering carbon, trapping sediment, and filtering pollutants for clean water.

Learn more (opens in a new tab)

Aerial view of restored wetlands showing curved water channels and vegetation used for Illinois Tollway environmental mitigation efforts.

 

Building Green

Green excavator icon representing Building Green construction practices.The Illinois Tollway seeks to minimize the environmental impact of roadway construction and maintenance by reducing, recycling and reusing materials such as asphalt shingles, tire rubber and reclaimed asphalt, and using materials and designs to build longer-lasting roads and bridges. The Illinois Tollway is committed to using green technology, as well as adopting research initiatives and best practices.

The Tollway applies green construction practices by:

Worker operating heavy equipment at a roadway construction site with recycled aggregate/stone in the foreground.

 

Energy Efficiency

Green lightbulb icon representing energy efficiency initiatives.The Illinois Tollway’s commitment to becoming a leader in sustainability includes using renewable energy and green technologies and adopting research initiatives and best practices to reduce energy use and costs. This includes building LEED-certified maintenance facilities, converting roadway lighting to LED lighting and researching use of invasives as energy sources. 

Rooftop solar panel array supporting Illinois Tollway energy efficiency and renewable energy efforts.

 

Stormwater

Green water droplets icon representing stormwater management and water quality initiatives.The Illinois Tollway provides Annual Reports to the Illinois Environmental Protection Agency (IEPA) as required by NPDES permit number ILR400494 for Stormwater Discharges from an MS4 (Municipal Separate Storm Sewer System). Typical best management practices (BMPs) utilized by Tollway projects to improve water quality include naturalized detention ponds, vegetated roadside ditches, and bioswales. As required by the permit, the Tollway evaluates the effectiveness of stormwater BMPs and has performed detailed analysis of the North Tri-State bioswales. Pollutant reductions resulting from the bioswale evaluation can be found in the Monitoring and Reporting section of the NPDES Annual Report.

Learn more about stormwater management (opens in a new tab)

Stormwater bioswale and vegetated detention area demonstrating Illinois Tollway best management practices for water quality improvement.