The North Avenue at I-294 Interchange Project delivered a new exit ramp from the southbound Tri-State Tollway (I-294) to County Line Road to improve access to North Avenue and Lake Street, as well as reduce congestion and improve traffic flow on existing roadways within the project area. The new ramp is now open. Read more here.
In partnership with the Illinois Tollway and the cities of Northlake and Elmhurst, Cook County led the project's design and is constructing the local road improvements.
The project was completed in 2025.
Cook County Project Information
Work Zone Safety
The Illinois Tollway is committed to ensuring that the Tri-State Tollway (I-294) remains safe for both drivers and workers during construction, which is part of the agency’s overall commitment to roadway safety.
Work zone speed limits are in effect in all construction zones 24/7 and drivers should continue to watch for changing traffic patterns and use caution, especially when workers are present.
Visit the Tollway’s Work Zone Safety page at illinoistollway.com.
Key Project Benefits
- A decrease in travel times by 15 percent to 65 percent including truck traffic.
- Traffic traveling from southbound I-294 to the area is expected to see: a decrease in average traffic by 10 percent to 30 percent.
- A decrease in fuel consumption with an annual average savings of $300.